Nathaniel Newton School Plantroom

Categories: Education
Tags: Plantroom

Project Overview

Project Overview

· Client: Dodd Group (Midlands) Ltd

· Location: Nuneaton

· Duration: 6 weeks (plus some live-term works)

D & T Mechanical was appointed by Dodd Group to deliver a complete strip-out and replacement of the school’s ageing plantroom.

Key works included:

· Removal, isolation, and drain down of existing services.

· Installation of three new boilers, with pre-fabricated 4″ heating headers and 80mm gas pipework.

· Traditional screwed pipework on site, with larger-bore heating fabricated off site for faster installation.

· Press-fit copper domestic services to a new hot water cylinder, expansion vessel, and microfill unit.

· All plant fitted with individual drain points, feeding into a new 2″ solvent weld float.

The Challenge

The works were carried out on a live school site. While most of the installation was completed during the six-week summer break, some activity continued while the school was operational. Ensuring that heating and water services remained available to staff and pupils required careful planning and phased works.

D & T Mechanical's Role

Dodd Group selected D & T Mechanical following a competitive tender. with no direct labour available for this project, Dodd needed a partner who could guarantee quality delivery and reliability. D & T impressed on a previous project and quickly became a trusted supply chain partner.

The Results

The plantroom upgrade was delivered within programme, to a high standard, and with minimal disruption to the school’s operation. The offsite fabrication element reduced time on site and improved safety.

Client Feedback

“I would definitely recommend D & T 100%. They’re reliable, trustworthy, and when they say they’ll get it done, they do. The quality of work is always good and they keep communication clear throughout.” — Darryl Joyce, Mechanical Projects Engineer, Dodd Group (Midlands) Ltd