Facilities of Arts & Humanities, Coventry University

Duration: 2 Years

Supply and install new piped services within an existing 8-storey building, a 4-storey building and a 4-storey new build link.

Traditional welded and threaded heating system installation comprised 500+ radiators, 200+ radiant panels, underfloor heating, and various over-door heaters.

All welded works were prefabricated off-site and delivered for installation.

Brazed and soldered installation of the domestic services. New pipework serving core toilet areas on each floor, shower areas and multiple kitchenette and tea point areas.

Solvent weld above-ground drainage and rainwater pipework serving the buildings.