Manor Drive Academy, Peterborough

Duration: 1 Year

Supply and install new piped services to a purpose-built 3-storey primary and secondary school in Peterborough.

Piped services connected to and extended away from corridor modules and riser.

Welded, threaded, and press-fit heating system connections to various HRUs within the classrooms and high-level heaters in sports halls and drama studios.

Welded and threaded gas main rising through the building, serving the classroom laboratories and running across the roof to serve the prefabricated packaged plant room.

Press fit installation of the domestic services serving various toilet areas, classroom sinks and drinking fountains.

Fusion weld chemical drainage serving the classroom laboratories
Solvent weld above-ground drainage and rainwater serving the building.