One Centenary Way, Birmingham

Duration: 1 Year

Supply and install new piped services across 16 floors for the CAT A installation of a new build office block in the centre of Birmingham.

Welded, threaded and Victaulic installation of the heating and chilled water systems. Riser pipework and valve arrangements serving each floor.

Brazed and soldered installation of the domestic services from tank room to roof. Core area risers and toilet blocks serving each floor.

Fusion weld HDPE and solvent weld above-ground drainage and rainwater pipework serving the building.