De-commission, remove, supply and install an energy centre and a plant room. We also produced a fully coordinated 3D model of the works.
We kept services within the building live using a temporary heating and hot water plant. This system enabled the university to operate as usual with minimal disruption.
Pipework served boilers, CHP, blast air coolers, chillers, buffer vessels, plate heat exchanges, circulation pumps, side stream filtration units, x-pots, pressurisation units and expansion vessels.
Systems were controlled using multiple differential pressure control valves, pressure independent control valves and double regulating control valves, including commissioning stations.
Welded and threaded heating, chilled and gas systems.
Brazed and soldered mains cold, boosted cold and hot water services.
Solvent weld above ground and condensate drainage.